News: Naranjos II - Clogging N5 & Sanitation Preventive Maintenance

Dear owners and residents of Naranjos II,
Please be informed that on 14 April 2025 there was a new blockage at the end of the pipe that connects the sanitation pipes of the block from N381 to N404 with the general sanitation pipe in the road.
We would like to take this opportunity to remind you that the design and configuration of the sewage network is not designed to destroy wipes or any other solid objects such as nappies, so owners are asked to refrain from dumping any such objects. It is also recommended that they do not use the toilet to dispose of toilet paper because this waste inevitably passes into the general network as a result of the pressure of the flushing water, which can cause blockages not only in the pipes, but also the breakdown of the pumping unit.
Please be informed that, in the event of such blockages occurring, the cost of resolving them will be charged to the properties where the aforementioned service is provided, as, as they are normally urgent, they have a higher cost than the maintenance programmed by the Community.
Thanking you in advance for your attention and cooperation, we send you my best regards.